Security device is core in the researching and development of Beston pyrolysis plant

Security is the most important thing in the production. Through continuous researches and development, Beston has designed the waste pyrolysis plant with advanced security device, which can guarantee safety and no pollution in production.

Beston Pyrolysis Plant Design
Beston Pyrolysis Plant Design

1. Specific operating tech to deal with all the bug during the production

2. Hydroseal and Vacuum system will prevent exhaust gas from going back to condensers and reactor. Thus, unnecessary accident can be avoided.

3. Equipped with thermometer, pressure gauge, safety valve and electric control system.

4. Combustible gas can be purified in hydroseal before being burnt which prevents the dangers that exhaust gas (C1-C4 ) may causes.

5. Waste gas burner can prevent over-pressure of the reactor.

6. Equipped with safety device (alarm for over temperature and pressure, auto pressure releasing system, extra gas recycling system, fire fighting devices), which can prevent unnecessary accident and guarantee safety in production.

Security responsibility is extremely heavy. We want to establish a good reputation image in the competitive market, so we must concentrate greatly on the safety and quality issue, and want to provide the first security umbrella to protect people and property from loss.

Besides the featured advantage of safe, Beston pyrolysis machines also has many other characteristics, such as energy-saving, non-pollution, environmental-friendly, high efficiency, high oil yield, high-quality final products, multiple choices, etc. Please contact us for more details.

    Contact Us

    The following items will help you identify key information about your project, which will enable us to work on a competitive solution proposal.

    Please specify your requirement by referring to the following aspects:

    1. What kind of solution will meet your demand? (Key point)

    2. What kind of material and expected end product are you planning to have?

    3. When is the project supposed to be running? (Key info for A-Z project programming)

    4. Budget for machinery purchasing? (Key info for right model)

    5. Points that you really focus on. (Customized service from our project consultant)